    Hi
    I was wondering if anyone has had experience with a system like this or similar. Pro and Cons would be much appreciated.
    [​IMG]
     
  2. PapaGoose03

    PapaGoose03 Grand High Pooh-Bah (6,057) May 30, 2005 Michigan
    BA4LYFE Society Pooh-Bah

    Welcome to the BA site, Hophaus, and to the Homebrewing forum. Can you give us a little more info about this system, a link to a website, etc. I doubt that few if any members in this forum has experience with this system because it appears to go beyond the typical homebrewing level. With some additional information you'll probably get some opinions about its features, etc. but maybe no first-hand experience. You could try asking your question at probrewer.com for some feedback.
     
  3. premierpro

    premierpro Savant (1,060) Mar 21, 2009 Michigan

    Looks like a nice little system. I am sure it will make beer.
     
    Hophaus and JackHorzempa like this.
  4. Hogue2112

    Hogue2112 Initiate (0) Apr 7, 2016 Ohio

    Looks expensive! Although, $ is totally relative.

    I'd definitely try to brew on it if I was around!
     
  5. DunkelFester

    DunkelFester Zealot (607) Aug 24, 2004 Pennsylvania

    Hophaus and Hogue2112 like this.
  6. Hophaus

    Hophaus Initiate (0) Jul 16, 2016 Australia

    I do a lot of trade with various companies in China, so dealing with China isn't a problem for us as we have people on the ground over there.
    This unit is $5000USD, basically a nano version of a micro setup. I was just enquiring if anyone's had experience brewing in a 50L size with a similar or exact setup.
     
  7. Hophaus

    Hophaus Initiate (0) Jul 16, 2016 Australia

    2HL Beer equipment standard configuration system


    Specification

    Daily output 2HL beer per day, 12-15 days fermentation period
    Total water content 1t per day

    Raw material consumption
    Malt: 40 KG, Hops: 0.12KG, Yeast: 0.2KG.

    Floor area
    25square meters approx

    Cooling System
    The heat exchanger & refrigeration unit

    Material:
    Inner: SUS 304, 2.5mm; External-Jacket: red copper (Wire-drawing/mirror polish plate), 1.5mm;
    Cylinder-(Oval, red copper), 2.5mm.
    Platform with handrails
    Inner surface treatment: welds grinded to Ra 0.6µm.CIP omni cleaning ball
    Insulation: Polyurethane-thickness 80 mm.
    Equip with : Mash agitate machine with reduction gearbox


    Fermentation tank
    Material:
    Inner: SUS304, 2.5mm; External-Jacket: SUS 304, Oval head cone bottom, thickness: 1.5mm.
    Inner surface treatment: welds grinded to Ra 0.4µm (attached omni cleaning ball).


    Glycol cooling system
    Insulation: Polyurethane-thickness 80 mm.
    Equip with: cone 60-75°resist compression design

    PLC control system & Digital display control table

    Plate type heat exchanger
     