Hey all, New to the hombrew section although I've been homebrewing for about 5 years. I previously used a single tier Keggle setup, but wanted to show off the build a friend of mine have been putting together for the last couple weeks. Still waiting on a transformer for the controller and a couple of minor parts, but we're hoping to test next week and take a whole day for measuring and brewing in less than 2 weeks. 15 Gallon SS Brewtech pots 24 Volt Honeywell gas valves with pilot (LP) Blichmann Therminator Chugger pumps All stainless tri-clamp fittings Cheers! (The yellow loc-line has been attached to the under side of the lids)
We cut the hoses long enough to be able to lift and move the lids, but may end up shortening them in the future. We also didn't want the hoses to kink and also installed elbows where we though appropriate. I think we are around $3000 or so. We had a wiring hiccup with the 2 Auber controllers and just need to switch a wire today (I hope). I'm planning to shoot a whole brew day as well as shoot some of the details of the brew setup.